Rooftop delivery is standard practice since a bundle of 20 shingles weighs close to 70 pounds. The shingles should be delivered directly to the roof by the supply company. Ideally, the shingles should be delivered soon after the new felt paper has been installed. Apply the protection in a single strip across the length of the roof. This prevents water from melted snow and ice from leaking under the lower rows of shingles.
Home designer pro roof tutorial install#
If your area has snow and ice, install ice protection underlayment on the lower section of the roof deck. When you reach the ridge, continue the felt paper over the ridge. Begin about 1/2-inch up from the end of the drip edge. Nail down the felt paper with roofing nails. This allows the water to run into the gutters without running down the fascia board. Include a gap of about 1/2-inch between the edge of the deck and the beginning of the drip edge. Use the roofing nails to nail the aluminum drip edge to the edge of the roof deck. For safety, pick up these shingles immediately and throw them to the disposal spot. Loose shingles should slide toward the gutters. Push the tools upward (toward the ridge), under both the felt paper and shingles. Work down the rows of shingles to the edge of the roof. Force the tools under the ridge cap to remove it. With the roofing shovel and pry bar, start at the roof ridge. If you’re able to have the dumpster parked close to the house, you may be able to throw many of the old shingles directly into the dumpster. Decide on one area where the shingles will be thrown and lay out plastic sheeting there as well. Prepare Work SiteĬover all nearby plants with plastic sheeting. Rolloff dumpsters parked on the public street usually require permits. Re-roofing may require a permit due to the increased static load on the roof. Like-in-kind roofing, where sheathing is not removed, may not require a permit. Since a variety of factors apply, it is important to talk to your local permitting department. Your community may require you to obtain a building permit to install a new roof. Existing roof has no more than one layer of shingles.Both existing shingles and new shingles are asphalt or composite.It’s also less expensive since shingle disposal fees are eliminated.
:max_bytes(150000):strip_icc()/2015Suitedollhouse-57a9b6045f9b58974a2210c5.png)
With re-roofing, the new shingles are installed directly on the existing shingles.

Replacement allows you to fix problems under the existing shingles. With replacement, the shingles are removed and then replaced with new shingles. Assess Roof: Replace or Re-RoofĪ roof can either be completely replaced or re-roofed.
Home designer pro roof tutorial code#

OSHA publication “ Protecting Roofing Workers” can advise you about staying safe when roofing. To prevent falls, set up either a Personal Fall Arrest System (slows and stops falls) or a fixed Fall Restraint System (prevents access to the roof edge).

Ladders should be mounted on firm, level ground. Be careful of how and where you place the ladders. Injury from a fall is a danger for anyone roofing a house. When it is freezing or near-freezing, the asphalt adhesive on the shingles will not stick. Depending on your area, this may be in the summer months.Įven during summer, don’t assume fair weather, so always check the 10-day weather forecast before tearing off the old roofing. On Networx's Website When to Roof a HouseĪs a DIYer, afford yourself as much favorable weather as possible-long days that are warm and dry.